Basement construction system for existing building - erects root piles, concrete floor slab, foundation tunnels and shafts, and provides ceilings in excavated space
申请公布号:DE4106160(A1)
申请号:DE19914106160
申请日期:1991.02.27
申请公布日期:1992.09.03
发明人:DUEMKE, FRANZ, DIPL.-ING., 8014 NEUBIBERG, DE;HERTLE, EDMUND, DIPL.-ING., 8033 PLANEGG, DE;PAUL, FRIEDRICH, DIPL.-ING., 8122 PENZBERG, DE
分类号:E02D27/48;E04B1/35
主分类号:E02D27/48
摘要:The system is for construction of a basement under an existing building. Root piles are placed on either side of the existing supporting walls, the walls are cut horizontally and supported via beams on these piles, an excavation is made under the foundations resp. a basement, and a supporting reinforced concrete slab to support the building is erected. One or more foundation tunnels are dug in the footings area of the lowest storey to be constructed; shafts are excavated between concrete slab and tunnels; piles are erected on bases in the foundation tunnels, to support the concrete slab. The remaining ground is then excavated, and the intermediate ceilings for the remaining basement storeys are constructed.
ELECTROMAGNETIC WAVE SHIELDING FILM FOR ELECTRONIC COMPONENT AND ITS MANUFACTURE
ATTACHING CHASSIS FOR MECHANISM COMPONENT OF ELECTRONIC APPARATUS
MANUFACTURE OF FIELD-EFFECT TRANSISTOR
AUTOMATICALLY COMING-OUT AND RETURNING-BACK TYPE INPUT DEVICE
METHOD AND DEVICE FOR INSPECTING PACKAGE SHAPE
MANUFACTURE OF SEMICONDUCTOR DEVICE
METHOD FOR FORMING SMALL DIAMETER THROUGH HOLE AND VIA HOLE
SILICON SUBSTRATE HAVING PHTHALOCYANINE THIN FILM AND MANUFACTURE THEREOF