船舶の建造方法
申请公布号:JP5774831(B2)
申请号:JP20100225302
申请日期:2010.10.05
申请公布日期:2015.09.09
分类号:B63B9/00;B63B9/06;B63H23/34;B63H23/36
主分类号:B63B9/00
摘要:<p><P>PROBLEM TO BE SOLVED: To provide a ship building method that allows accurate and quick adjustment of the axial center of a series of shafts from a crankshaft of an engine to a propeller shaft via an intermediate shaft and reduces the period for occupying the building berth in order to build a hull, and consequently, achieves a reduction in ship building costs. <P>SOLUTION: A ship building method is configured to build a ship by first assembly work (a) for assembling individual hull blocks at an assembly factory, and second assembly work (b-i) for building a hull by joining the individual hull blocks, each assembled by the first assembly work, to each other by welding on a building berth is characterized in that a stern block to be assembled by the first assembly work undergoes the second assembly work through the preliminary assembly process comprising the process K for mounting a stern tube to the same, the process L for mounting a propeller shaft to the stern tube, and further, the process M for fixing a propeller to the propeller shaft. is executed after transferring the preliminarily-assembled stern block onto the building berth. <P>COPYRIGHT: (C)2012,JPO&INPIT</p>
CONSERVED AND SPECIFIC STREPTOCOCCAL GENOMES
ANTIMICROBIAL COMPOSITIONS CONTAINING COLLOIDS OF OLIGODYNAMIC METALS
BIODEGRADABLE RESIN COMPOSITION
METHOD OF EVALUATING CORE BASED SYSTEM-ON-A-CHIP
MOORING OF A FLOATABLE UNIT TO A VESSEL SIDE
Pigment-basierte schwarze Tinte
Flüssigkeitsdichtungbaugruppe für ein Drucksystem
Getriebe für ein Kraftfahrzeug sowie Verdrängungskörper für ein derartiges Getriebe